Taranaki Pine

Smarter Industrial Expansion in Taranaki

image
  • Client

    Taranaki Pine

  • Industry

    Manufacturing + Industrial

  • Location

    New Plymouth, Taranaki

  • Completion

    March 2025

  • Project Size

    540sqm

  • System

    SuperSpan™ Structural Beam System

Structural Performance with Reduced Cost and Environmental Impact

Taranaki Pine required a 540sqm extension to expand operational capacity at its New Plymouth facility. The brief called for additional clearspan floor area that matched the structural performance of the existing building, while improving cost efficiency and reducing environmental impact.

 

Traditional structural methods would have replicated the same material intensity and cost profile. Instead, Taranaki Pine partnered with Chris Bell Construction and Formsteel to engineer and deliver a more efficient structural solution.

 

Formsteel implemented its SuperSpan™ system to optimise beam geometry and reduce overall steel tonnage while maintaining the required clearspan capability. Working alongside Chris Bell Construction, the coordinated structural and build programme ensured seamless integration with the existing facility and efficient on-site execution.

 

The result was a 540sqm extension delivered with approximately 25% cost savings and around half the carbon footprint of a conventional structural steel solution, without compromising strength, span, or durability.

image
image
image
image
image
image
image

Challenges + Solutions

  • Coordinated Construction

    Formsteel worked alongside Chris Bell Construction to align structural engineering and on-site execution.

  • Clearspan Continuity

    SuperSpan™ beams delivered the same unobstructed internal span as conventional structural steel systems.

  • Carbon Reduction

    Optimised beam design reduced steel tonnage and embodied carbon without compromising structural integrity.

  • Cost Efficiency

    The structural system was engineered to reduce overall construction cost while maintaining clearspan performance.

  • Seamless Integration

    The extension was designed to connect efficiently with the existing facility while maintaining operational continuity.

image

By engineering smarter beam geometry rather than replicating conventional methods, we delivered a 540sqm clearspan extension for Taranaki Pine with approximately 25% cost savings and around half the carbon footprint of a traditional build.

  • image

    Coordinated Delivery

    Structural engineering and construction were aligned through collaboration with Chris Bell Construction.

  • image

    Smarter Material Use

    High-tensile formed beams achieved required structural performance using significantly less steel.

  • image

    Seamless Integration

    The new structure was engineered to connect efficiently with the existing facility.

  • image

    Greater Open Span Areas

    The extension maintained the same unobstructed internal span as traditional structural steel construction.

  • image

    Lower Total Build Cost

    Optimised beam design and material efficiency reduced overall construction expenditure.

  • image

    Environmental Performance

    Material optimisation contributed to a significantly lower carbon footprint.

“ Formsteel has the potential to change the commercial construction game. It’s a building system that’s lower cost, simpler to construct, faster to build, and lighter. All those things add up and it’s just a better, completely new approach. Of course, we can’t forget that Formsteel is the greenest option out there and that’s something to be seriously considered. ”

Campbell Barbour

NZRPG

See Project

“Formsteel as a building solution has undeniably changed the game for large-scale commercial construction projects. Starting with the Formsteel system from the inception of a project ensures cost effective, simple build solutions with a shorter build timeframe. It just makes sense."

Bojana Hynes

Cottee Parker Architects

See Project

“The real benefit of Formsteel is that it allows us as developers to deliver quality buildings that are faster and more cost effective to build. 47% less embodied carbon; this is becoming a bigger and bigger deal. Formsteel source from reputable mills, they are a lot quicker to build with than traditional steel, and cheaper. That's why we are interested in it.

Alan Lockie

Stride Property

See Project

Related Projects

View All

Featured Projects

  • image

    Foodie Supermarket

    Retail+Commercial

    6,500m2

  • Northside3

    Northside

    Storage+Logistics

    4,300m2

  • image

    Nutrinza Bulk Storage

    Manufacturing+Industrial

    4,858m2

  • image

    Heliflite Hangar

    Aerospace+Aviation

    750m2